Les chantiers du Grand Paris Express sont aussi l’occasion d’innovations, à grande et à plus petite échelle, pour améliorer les conditions de travail. Illustration avec la première utilisation d’un tunnelier vertical en France, et avec un outil de percement aménagé pour réduire l’exposition des compagnons aux vibrations et aux poussières
Room for innovation
Back to MSDs and filter
Room for innovation
De la place pour les innovations
Description
The Grand Paris Express construction sites are also an opportunity for innovation, on a large and smaller scale, to improve working conditions. This is illustrated by the first use of a vertical tunnel boring machine in France, and by a drilling tool designed to reduce workers' exposure to vibrations and dust.
Access tool
Language of original language description
French
Other data
Sector / Indrustry covered
Строителство и поддръжка
Hazards
Ръчна обработка на товари
Вибрации
Health effects
Неконкретни МСС
Worker groups covered (vulnerable groups etc.)
Всички (без специална група)
Prevention measures
Технически мерки, например ергономично оборудване
Purpose of the material
Повишаване на осведомеността
Target audience
Всички (без конкретна целева аудитория)
Year
2019