Les chantiers du Grand Paris Express sont aussi l’occasion d’innovations, à grande et à plus petite échelle, pour améliorer les conditions de travail. Illustration avec la première utilisation d’un tunnelier vertical en France, et avec un outil de percement aménagé pour réduire l’exposition des compagnons aux vibrations et aux poussières
Room for innovation
Back to MSDs and filter
Room for innovation
De la place pour les innovations
Description
The Grand Paris Express construction sites are also an opportunity for innovation, on a large and smaller scale, to improve working conditions. This is illustrated by the first use of a vertical tunnel boring machine in France, and by a drilling tool designed to reduce workers' exposure to vibrations and dust.
Access tool
Language of original language description
French
Other data
Sector / Indrustry covered
Byggingarvinna og viðhald
Hazards
Handvirk meðhöndlun á byrði
Titringur
Health effects
Óskilgreind stoðkerfisvandamál
Worker groups covered (vulnerable groups etc.)
Allir (enginn sérstakur hópur)
Prevention measures
Tæknilegar ráðstafanir, t.d. vinnuvistfræðilegur búnaður
Purpose of the material
Vitundarvakning
Target audience
Allir (enginn sérstakur markhópur)
Year
2019