The shaft assembly phase (when inserting the steel shaft into the body) of yacht building was particularly critical. The risk of manual handling was very important. The main problems identified were: the excess weight lifted per subject (exceeded 30 kg); unnatural postures had to be adopted; operations were carried out in narrow spaces; an inadequate grip; shaft falling risk; … For all the reasons a new design of the shafting and handling system was required.